Battery Energy Management System (EMS) for Battery Energy Storage Systems (BESS).
bess-ems plans, monitors and controls battery storage systems, taking into
account market mechanisms, real-time measurement data, technical limits and
safety requirements. The system is modular, containerised, and designed so that
market optimisation and technical control are strictly separated.
Status: M1–M6 are complete;
v1.0.0is released (Release, Roadmap, Release process)
Measurements
→ Validation
→ Snapshot
→ State Machine
→ Market / schedule resolution
→ Ancillary-services prioritisation (if enabled)
→ Constraint Limiter
→ Ramp Limiter
→ Command
→ Protocol Adapter
The central architectural rule:
Optimisation produces desired values. The technical control loop decides what can be operated safely.
Optimisation results are never sent directly to battery systems; they are always routed through the State Machine, Constraint Limiter and Ramp Limiter.
The system addresses, among other things:
- Day-ahead market, intraday market, ancillary services
- Charge and discharge control with power ramps
- State machines for operational and safety states
- PID control, MPC / state-space models (planned)
- LP / MILP / heuristic optimisation via a pluggable solver interface
- Field communication via Modbus TCP, MQTT and (post-MVP) OPC-UA
- Near-real-time measurement processing with data-quality assessment
- Persistence, auditability and monitoring
| Area | Technology |
|---|---|
| Main platform | C# / .NET 10 |
| API | ASP.NET Core Minimal API |
| Performance-critical core | C / C++ (optional native core via C ABI) |
| Persistence (MVP) | PostgreSQL via Dapper + Npgsql |
| Messaging / fieldbus | MQTTnet, FluentModbus; OPC-UA post-MVP |
| Simulator | Go field simulator for Modbus/MQTT |
| Operations / gates | Linux, Docker, Dockerfile stages, Makefile |
| Observability | Structured logs; Prometheus/OTel incrementally |
Detailed definitions, responsibilities and boundaries are documented in
spec/architecture.md.
- Domain Layer
- Market Layer
- Optimization Layer
- Realtime Layer
- Control Layer
- Protocol Adapter Layer
- Infrastructure Layer
- API Layer
- Native Core Layer (optional)
Protocol adapters contain only transformations between external signals and internal models — no market, optimisation or control decisions.
Active power at the battery storage system:
> 0 kW→ discharging / feeding in< 0 kW→ charging / drawing0 kW→ no active charge or discharge command
This convention is used consistently internally. Deviating device conventions are mapped exclusively inside protocol adapters.
Safe state in the MVP means:
- no active charge or discharge command
- no forwarding of stale or invalid commands
- emission of a
0 kWcommand, an explicit stop command, or disabling of the output - a persisted and logged reason
Priority order in the control loop:
- Emergency Stop
- Battery, inverter and grid limits
- Ancillary-services activation
- Binding market obligations
- Intraday schedule
- Day-ahead schedule
- Local optimisation
Software-side stop and safety functions do not replace a hardware emergency stop, BMS protection mechanisms or vendor-specific inverter protections. Hard real-time and certification-relevant functions must be implemented outside the Docker-based EMS.
The Go field simulator under simulators/bess-field-sim is a test tool: MQTT
runs there deliberately anonymously and in plaintext over tcp:// without TLS
or credentials. This is intended only for local Mosquitto / CI simulations and
not for production brokers.
- C# / .NET Worker Service
- Domain model, Realtime Snapshot Store, State Machine
- Constraint Limiter, Ramp Limiter
- Optimisation interface (without a production solver)
- MQTT and Modbus-TCP adapters
- Static schedule import, simple day-ahead schedule tracking
- PostgreSQL persistence
- Health, status, command, schedule and operator-stop API (write access with AuthN/AuthZ and audit log)
- Structured logs
- Docker Compose
- Unit tests for core logic
The authoritative module and layer structure is described in
spec/architecture.md. The most important entry points
in the repository are:
BatteryEms.sln— .NET solutionsrc/hexagon/— domain and application coresrc/adapters/— driving adapters (API, worker) and driven adapters (Modbus, MQTT, persistence, optimisation, telemetry)src/infrastructure/— infrastructure implementationstests/— architecture, unit and integration testsconfig/— JSON schemas and example configurationssimulators/bess-field-sim/— Go field simulatordocs/plan/— roadmap, active and pending detailed plans
Container image (signed via Cosign keyless, SBOM-attested):
docker pull ghcr.io/pt9912/bess-ems:v1.0.0
# or :1.0.0 / :latestHelm chart, source tarball, native libbattery_control_core.so plus headers,
SBOM and SHA256SUMS are published as release assets:
Release v1.0.0.
Verifying the image signature:
cosign verify ghcr.io/pt9912/bess-ems:v1.0.0 \
--certificate-identity-regexp '^https://github.com/pt9912/bess-ems/.*' \
--certificate-oidc-issuer 'https://token.actions.githubusercontent.com'Full release-process documentation in
docs/user/releasing.md.
The active gate targets are visible in the Makefile:
make help
make lint
make arch-check
make test
make test-safety
make coverage-gate
make simulator-test
make test-integrationV-model–style requirements structure with identifiers and traceability from
requirement → design → implementation → test. Requirements are uniquely
referenceable in the specification with prefixes (e.g. LH-CTRL-002,
LH-SAFE-001).
spec/lastenheft.md— complete requirements, acceptance criteria, traceability tables, risks and open itemsspec/architecture.md— architecture design: layers, modules, data flow, native-core strategy, traceabilitydocs/plan/planning/in-progress/roadmap.md— milestones M1–M6 with deliverables and LH traceabilitydocs/user/releasing.md— release process, tag contract, workflow steps, rollbackdocs/user/quality.md— binding quality and measurement paths (static analysis C# / .NET + C / C++, tests, coverage, contract gates, native parity, CI/release)docs/archive/idea.md— historical native-core idea sketch, non-normative
- grid-gym — deterministic
simulation, replay and fault-injection platform for smart-grid and EMS
systems; a natural test and HIL companion for
bess-ems. - grid-guide — local desktop assistant for preparing grid-connection and authority applications for PV, storage and generation plants; covers the installation and permitting stage that precedes EMS operation.
Released under the MIT License.