MS18: extend target one week to 2026-06-07#89
Conversation
Rachel's footage is captured; remaining MS18 work is editing and publishing. The 2026-05-31 hard cap (set against Rachel's availability) no longer applies. MS19/MS20/MS21 dates unchanged — MS18 runs in parallel with MS19 and the extension does not cascade. - milestones.ics MS18 DTEND 20260601 -> 20260608 - PLAN.md target 2026-05-31 -> 2026-06-07, status/next-action refreshed - 18 milestone doc: hard-cap rationale replaced with current state - x18.3 strategy doc: section 3 status reflects post-capture phase - 19 milestone doc: drop stale "blocked on Rachel" parenthetical Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
MS18 video footage is captured and MS18 target is extended to 2026-06-07 (see PR #89). MS19 doc no longer needs the parenthetical flagging MS18 as Rachel-blocked. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
There was a problem hiding this comment.
💡 Codex Review
Here are some automated review suggestions for this pull request.
Reviewed commit: 765879e2d4
ℹ️ About Codex in GitHub
Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you
- Open a pull request for review
- Mark a draft as ready
- Comment "@codex review".
If Codex has suggestions, it will comment; otherwise it will react with 👍.
Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".
| # MS18 Phase 3 Strategy — Site Architecture, Publishing & SEO Hygiene | ||
|
|
||
| Status: In progress — sections 1–2 complete; section 3 (video) blocked on Rachel's availability through the 2026-05-31 hard cap. | ||
| Status: In progress — sections 1–2 complete; section 3 (video) in editing/publishing with Rachel's footage captured. |
There was a problem hiding this comment.
Mark recording complete in the video checklist
This status now says Rachel's footage is captured and the remaining work is editing/publishing, but the same strategy checklist still leaves Record. unchecked below. For anyone resuming MS18 from this execution doc, the unchecked recording task contradicts the new status/PLAN next action and can send work back to a step that is already done; please update the video-production checklist to reflect that recording is complete.
Useful? React with 👍 / 👎.
Summary
milestones.icsupdated so the Proton Calendar subscription reflects the new MS18 window as soon as this merges to main.Files changed
docs/milestones.ics— MS18 DTEND20260601→20260608.docs/PLAN.md— target column2026-05-31→2026-06-07; Current/Next-action lines refreshed to "video in editing/publishing";Last updatedbumped.docs/milestones/18_PRERELEASE_CONTENT_SEO.md— hard-cap rationale replaced with the new target and current state.docs/strategies/x18.3_SITE_ARCHITECTURE_AND_PUBLISHING.md— section 3 status reflects footage captured.docs/milestones/19_RC_HARDENING_OPS.md— drops the now-stale "MS18 blocked on Rachel" parenthetical; MS19 schedule untouched.Test plan
PR Testsgreen.🤖 Generated with Claude Code