Proposal: GBBC RMF Canton Operationalization Framework#341
Proposal: GBBC RMF Canton Operationalization Framework#341nikos-metrika wants to merge 7 commits into
Conversation
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
|
@nikos-metrika, your proposal is missing a Special Interest Group (SIG) label. Adding the right SIG label ensures the relevant domain experts can find and review your proposal, Check more about SIGs. Please add one of the following labels to this PR:
Not sure which one fits? Pick the closest match to your proposal's domain. You can add a label from the right sidebar under "Labels". |
|
@nikos-metrika, thank you for your interest in the Canton Development Fund! Your proposal needs a valid Tech & Ops Committee champion organization. The champion field is either empty, contains placeholder text, or names an organization that is not a current Tech & Ops Committee member. Per CIP-0100, all external proposals require a Tech & Ops Committee champion. Next steps:
If you need help finding a champion, reach out to SIGs or any Tech & Ops Committee member. This PR is being closed automatically. You are welcome to reopen it once a champion is confirmed. |
Signed-off-by: Nikos Andrikogiannopoulos <andriko@metrika.co>
|
Could you please provide some guidance on the correct process for adding the required labels (SIG, sponsor/champion) so the PR doesn’t automatically close? I noticed that in the main file, the SIG group and sponsor are already listed, so I wanted to make sure I’m following the expected process correctly. |
|
Thanks for the response. Let us look at the bot configuration but in the meantime it should be in the right spot now. |
|
Thank you @hythloda, appreciate the help. |
Development Fund Proposal Submission
Proposal file:
/proposals/gbbc-rmf-canton-operationalization-framework.mdSummary
This proposal establishes a standardized operational risk operationalization framework for Canton-based infrastructure through ecosystem-facing monitoring methodologies, governance-aligned operational oversight workflows, and implementation guidance aligned with the GBBC Risk Mitigation Framework (RMF).
The initiative focuses on operational resilience visibility, Super Validator accountability, governance transparency, onboarding assessment workflows, and continuously monitored operational oversight methodologies for ecosystem participants operating on or evaluating Canton-based infrastructure.
Checklist
/proposals/Notes for Reviewers
SIG Alignment:
regulatory-complianceThe proposal is designed as ecosystem-facing operational infrastructure and public-good operationalization guidance rather than application-specific tooling or protocol modifications.
The implementation operates exclusively as an external operational oversight layer atop existing Canton telemetry surfaces and does not modify protocol logic, governance structures, or validator operations.