  • Co-Pilot undergoes its first iteration of UI design.

    Due by March 13, 2015
    5/5 issues closed
  • At this point the intial needs assessment process will be completed. This includes iniital surveys and follow-up interviews with digital security trainers as well as the analysis of the data collected.

    Due by January 22, 2015
    6/6 issues closed
  • At this point a full prototype of all co-pilot components will be completed and integrated into one cohesive package. The following components should be completed. * User facing access point * Monitoring of user traffic * Basic logic system for manipulating user traffic based upon monitoring * Trainer configuration interface for modifying logic rules * A set of pre-built rules for blocking some type of traffic * A short (activity](https://www.level-up.cc/leading-trainings/preparing-ADIDS-sessions/) for one of the pre-built rule sets.

    Due by March 27, 2015
    9/9 issues closed