Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
339 changes: 339 additions & 0 deletions ContinuousCode/3_Data4DM/Capability trap - Brad_V4_Ross-test.2mdl
Original file line number Diff line number Diff line change
@@ -0,0 +1,339 @@
{UTF-8}
Resources to Production IC=
1400
~ hours/Week [0,4000,80]
~ |

Process Problems IC=
0.4
~ [0,0.98,0.02]
~ |

Problem Introduction=
(Unattended Process Problem Level-Process Problems)/Avg Process Erosion Time
~
~ 0.4/16*0.625*(Process Problems/0.4)^alpha
|

alpha=
1
~ [0,1,0.1]
~ |

additional desired throughput=
300
~ [200,500,10]
~ |

Indicated Allocation to Production=
max(0,min(Available Time,Resource Gap+Resources to Production+pulse(time to impliment measure\
,shock duration)*Policy measure))
~
~ How many hours do you need to update production to fufill throughput gap
|

shock duration=
0
~ [0,100,4]
~ |

Policy measure=
0
~ [-4000,0,100]
~ |

Resources to Improve Process=
Available Time-Resources to Production
~
~ |

time to impliment measure=
0
~ [0,200,5]
~ |

Adjusting Allocation=
(Indicated Allocation to Production-Resources to Production)/Time to Adjust Allocation
~
~ |

Available Time=
4000
~ hours/Week
~ |

Avg Process Erosion Time=
32
~ Week
~ |

Defect Introduction=
Process Problems*Gross Process Throughput
~ units/Week
~ |

Desired Throughput=
900+additional desired throughput
~ units/Week [300,1800,20]
~ 900*1.2
900+STEP(180, 10 )
900+STEP(additional desired throughput,40)
|

Gross Process Throughput=
Resources to Production*Productivity of Production Time
~ units/Week
~ |

Net Process Throughput=
Gross Process Throughput-Defect Introduction
~ units/Week
~ |

Net Productivity of Production Time=
Productivity of Production Time*(1-Process Problems)
~ units/hour
~ How much of the time are you being productive
|

Problem Correction=
Problem Correction Effectiveness*(Process Problems/Time to Correct Problems)
~
~ |

Problem Correction Effectiveness=
Resources to Improve Process/Resources for Maximum Problem Correction
~
~ |

Process Problems= INTEG (
min(1,Problem Introduction-Problem Correction),
Process Problems IC)
~ units
~ Dimensionless index from 0 to 1
|

Productivity of Production Time=
1
~ units/hour
~ |

Resource Gap=
Throughput Gap/Net Productivity of Production Time
~ hour/Week
~ How many more hours would you really need to close throughput gap
|

Resources for Maximum Problem Correction=
4000
~ hours/Week
~ |

Resources to Production= INTEG (
Adjusting Allocation,
Resources to Production IC
)
~ hours/Week
~ |

Throughput Gap=
Desired Throughput-Net Process Throughput
~ units/Week
~ |

Time to Adjust Allocation=
12
~ Week [1,12,1]
~ |

Time to Correct Problems=
16
~ Week
~ |

Unattended Process Problem Level=
0.9
~
~ |

********************************************************
.Control
********************************************************~
Simulation Control Parameters
|

FINAL TIME=
500
~ Week
~ The final time for the simulation.
|

INITIAL TIME = 0
~ Week
~ The initial time for the simulation.
|

SAVEPER =
TIME STEP
~ Week [0,?]
~ The frequency with which output is stored.
|

TIME STEP = 0.25
~ Week [0,?]
~ The time step for the simulation.
|

\\\---/// Sketch information - do not modify anything except names
V300 Do not put anything below this section - it will be ignored
*View 1
$-1--1--1,0,|12||-1--1--1|-1--1--1|-1--1--1|-1--1--1|-1--1--1|96,96,100,0
10,1,Process Problems,403,186,43,23,3,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
12,2,48,180,187,10,8,0,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,3,5,2,100,0,0,22,0,192,0,-1--1--1,,1|(229,187)|
1,4,5,1,4,0,0,22,0,192,0,-1--1--1,,1|(320,187)|
11,5,0,275,187,6,8,34,3,0,2,1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
10,6,Problem Introduction,275,218,58,23,40,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
12,7,48,624,186,10,8,0,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,8,10,1,100,0,0,22,0,192,0,-1--1--1,,1|(485,186)|
1,9,10,7,4,0,0,22,0,192,0,-1--1--1,,1|(575,186)|
11,10,0,530,186,6,8,34,3,0,2,1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
10,11,Problem Correction,530,217,49,23,40,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
10,12,Time to Correct Problems,646,141,50,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
10,13,Avg Process Erosion Time,187,97,69,23,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
10,14,Unattended Process Problem Level,123,259,73,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||255-128-0,0,0,0,0,0,0
10,15,Defect Introduction,799,263,60,23,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,16,Productivity of Production Time,538,312,73,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,17,Gross Process Throughput,685,337,58,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,18,Net Process Throughput,798,435,64,23,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,19,Throughput Gap,758,546,58,23,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,20,Desired Throughput,883,499,58,23,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,21,Net Productivity of Production Time,744,650,80,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,22,Resource Gap,610,586,50,23,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,23,Indicated Allocation to Production,439,597,63,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,24,Time to Adjust Allocation,279,554,51,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,25,Available Time,149,590,47,23,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
10,26,Resources to Improve Process,360,386,56,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||0-128-64,0,0,0,0,0,0
10,27,Problem Correction Effectiveness,381,283,69,31,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||0-128-64,0,0,0,0,0,0
10,28,Resources for Maximum Problem Correction,182,342,72,40,8,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||0-128-64,0,0,0,0,0,0
1,29,12,10,1,0,0,0,0,192,0,-1--1--1,,1|(566,143)|
1,30,28,27,1,0,0,0,0,192,0,-1--1--1,,1|(298,286)|
1,31,26,27,1,0,0,0,0,192,0,-1--1--1,,1|(368,334)|
1,32,25,26,1,0,0,0,0,192,0,-1--1--1,,1|(200,479)|
10,33,Resources to Production,496,478,56,31,3,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
12,34,48,333,476,10,8,0,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,35,37,34,100,0,0,22,0,192,0,-1--1--1,,1|(364,476)|
1,36,37,33,4,0,0,22,0,192,0,-1--1--1,,1|(418,476)|
11,37,0,391,476,6,8,34,3,0,2,1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
10,38,Adjusting Allocation,391,507,51,23,40,3,0,2,-1,0,0,0,0-0-0,0-0-0,|||128-0-0,0,0,0,0,0,0
1,39,24,38,1,0,0,0,0,192,0,-1--1--1,,1|(334,501)|
1,40,23,38,1,0,0,0,0,192,0,-1--1--1,,1|(399,560)|
1,41,33,23,1,0,0,0,0,192,0,-1--1--1,,1|(517,553)|
1,42,22,23,1,0,0,0,0,192,0,-1--1--1,,1|(495,598)|
1,43,19,22,1,0,0,0,0,192,0,-1--1--1,,1|(696,567)|
1,44,21,22,1,0,0,0,0,192,0,-1--1--1,,1|(652,618)|
1,45,20,19,1,0,0,0,0,192,0,-1--1--1,,1|(813,546)|
1,46,18,19,1,0,0,0,0,192,0,-1--1--1,,1|(795,487)|
1,47,17,18,1,0,0,0,0,192,0,-1--1--1,,1|(775,357)|
1,48,15,18,1,0,0,0,0,192,0,-1--1--1,,1|(842,363)|
1,49,16,17,1,0,0,0,0,192,0,-1--1--1,,1|(615,334)|
1,50,33,17,1,0,0,0,0,192,0,-1--1--1,,1|(590,394)|
1,51,33,26,1,0,0,0,0,192,0,-1--1--1,,1|(423,386)|
1,52,27,11,1,0,0,0,0,192,0,-1--1--1,,1|(439,217)|
1,53,1,15,1,0,0,0,0,192,0,-1--1--1,,1|(540,70)|
1,54,33,37,1,0,0,0,0,192,0,-1--1--1,,1|(411,452)|
10,55,Productivity of Production Time,914,662,56,31,8,2,0,3,-1,0,0,0,128-128-128,0-0-0,|||128-128-128,0,0,0,0,0,0
1,56,55,21,0,0,0,0,0,192,0,-1--1--1,,1|(0,0)|
10,57,Process Problems,905,584,56,22,8,2,0,3,-1,0,0,0,128-128-128,0-0-0,|||128-128-128,0,0,0,0,0,0
1,58,57,21,0,0,0,0,0,192,0,-1--1--1,,1|(0,0)|
1,59,25,23,1,0,0,0,0,192,0,-1--1--1,,1|(251,610)|
1,60,17,15,1,0,0,0,0,64,0,-1--1--1,,1|(741,323)|
1,61,1,10,1,0,0,0,0,192,0,-1--1--1,,1|(482,153)|
12,62,0,1663,600,208,140,8,15,0,0,2,0,0,0,0,0,0,0,0,0
Process Problems,Graph
12,63,0,1663,323,208,140,8,15,0,0,2,0,0,0,0,0,0,0,0,0
Resources to Production,Graph
12,64,0,1248,601,208,140,8,15,0,0,2,0,0,0,0,0,0,0,0,0
Net Process Throughput,Graph
12,65,0,1248,324,208,140,8,15,0,0,2,0,0,0,0,0,0,0,0,0
Problem Correction,Graph
10,66,additional desired throughput,934,408,66,18,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,67,66,20,0,0,0,0,0,64,0,-1--1--1,,1|(0,0)|
10,68,FINAL TIME,982,88,41,22,8,2,0,3,-1,0,0,0,128-128-128,0-0-0,|||128-128-128,0,0,0,0,0,0
10,69,Policy measure,507,708,45,23,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,70,69,23,0,0,0,0,0,192,0,-1--1--1,,1|(0,0)|
10,71,time to impliment measure,387,713,62,18,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,72,71,23,0,0,0,0,0,64,0,-1--1--1,,1|(0,0)|
10,73,shock duration,598,688,53,10,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,74,73,23,0,0,0,0,0,64,0,-1--1--1,,1|(0,0)|
1,75,1,5,1,0,0,0,0,192,0,-1--1--1,,1|(342,123)|
10,76,alpha,555,-97,21,10,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
10,77,Resources to Production IC,615,473,50,18,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,78,77,33,0,0,0,0,0,64,1,-1--1--1,,1|(0,0)|
10,79,Process Problems IC,405,72,46,18,8,3,0,0,-1,0,0,0,0,0,0,0,0,0
1,80,79,1,0,0,0,0,0,64,1,-1--1--1,,1|(0,0)|
1,81,13,6,0,0,0,0,0,64,0,-1--1--1,,1|(0,0)|
1,82,14,6,0,0,0,0,0,64,0,-1--1--1,,1|(0,0)|
///---\\\
:GRAPH Process_Problems
:TITLE Process_Problems
:SCALE
:VAR Process Problems

:GRAPH Resources_to_Production
:TITLE Resources_to_Production
:SCALE
:VAR Resources to Production
:L<%^E!@
1:currentvectorv1.vdfx
1:currentvectorv2.vdfx
4:Time
5:additional desired throughput
9:currentvectorv1
19:100,0
24:0
25:2000
26:2000
60:
61:0
62:0
63:0
64:0
65:1
66:0
67:0
68:0
69:0
70:1
18:currentvectorv2.vsc
20:currentvectorv1.lst
15:0,0,0,0,0,0
27:0,
34:0,
42:1
72:0
73:0
35:Date
36:YYYY-MM-DD
37:2000
38:1
39:1
40:2
41:0
95:0
96:0
97:0
77:0
78:0
102:1
93:0
94:0
92:0
91:0
90:0
87:0
75:
43:
103:8,8,8,3,8
105:0,0,0,0,0,0,0,0,0,0
104:Arial|14||0-0-0|0-0-0|-1--1--1|0-0-255|192-192-192|-1--1--1
Loading