Skip to content

Transient effects #78

@ghost

Description

By adjusting traditional insulation layer thickness (and possibly conductivity if needed), as per ISO 10211 & RP-1365 methodologies, TBD does not significantly alter a construction's transient thermal response, à la RP-1145. This is described in a bit more detail in the last paragraph here. The current approach is deemed suitable/acceptable for well-insulated assemblies in cold climates, but decreasingly so in warmer climates and/or with less insulation.

The "equivalent wall" approach (example here) is a practical solution that - in principle - could be harnessed to solve the issue. However, it requires a priori knowledge - through physical testing or 2D (or 3D) numerical approximations - of a construction's transient response while factoring-in known thermal bridges. This may be feasible for minor thermal bridging (i.e. clear-field R-values), but appears somewhat impractical when considering major thermal bridging (i.e. what TBD tracks), given its surface-specific nature (i.e. unique geometry). In a nutshell, it would be interesting to investigate how to generalize the "equivalent wall" approach without a priori testing or 2D/3D simulations results.

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions