Skip to content

Phase 7 — Capture hardware design constraints before CAD #28

@IsiAzu

Description

@IsiAzu

Document all known constraints before Fusion 360 work begins. Must capture: PCB dimensions for compute board, flex cable routing requirements, battery placement in temples, heat dissipation paths, minimum lens and frame dimensions. Output is a constraints doc that gates the CAD start. Reference: Brilliant Labs Frame open hardware design, OpenGlass.

Metadata

Metadata

Assignees

Labels

No labels
No labels

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions